v2.0.2
AUTODOCS 2.0.2major
- 2.0.2-ADD-01AddedDigital signing on PDF documentsReviewers can annotate and mark up files submitted by contractors, apply their own signature, and save the result as a signed document that is forwarded to the next stage. Signed documents carry a digital seal and a QR code for verifying authenticity and confirming that the document has not been altered. Multiple signatures may be stored per user and selected at the time of signing.
Other changes in this release — AUTODOCS 2.0.2
- 2.0.2-CHG-01Role-based dashboard
- 2.0.2-ADD-02Approving multiple documents at once
- 2.0.2-ADD-03AI-assisted drafting of document details
- 2.0.2-CHG-02Redesigned Document Log
- 2.0.2-CHG-03Redesigned notification emails
- 2.0.2-ADD-04Custom document format
- 2.0.2-CHG-04Full mobile support
- 2.0.2-ADD-05Self-service account deletion
- 2.0.2-CHG-05Administrator tool improvements
- 2.0.2-ADD-06Opening a document from an email without signing in
- 2.0.2-ADD-07Release notes inside the system
- 2.0.2-ADD-08Reporting problems from inside the system
- 2.0.2-CHG-06Improvements to the workflow design tool
- 2.0.2-ADD-09Sign in with a Microsoft account
- 2.0.2-ADD-10A guided starting page for creating documents
- 2.0.2-ADD-11Pages explaining permissions and workflows
- 2.0.2-CHG-07Faster uploading of on-site photos
- 2.0.2-ADD-12A "Last 7 days" card on the user dashboard
- 2.0.2-CHG-08Dashboard cards can be dragged into order
- 2.0.2-ADD-13Plain-language error messages with a reference code
- 2.0.2-ADD-14Editing the project code from Settings
- 2.0.2-CHG-09Finding a document by part of its number
- 2.0.2-ADD-15Fine print in the text editor
- 2.0.2-CHG-10Company directory
- 2.0.2-FIX-01Viewing a photo at full size
- 2.0.2-ADD-16A "Where work is stuck" card on the dashboard
- 2.0.2-ADD-17A search box on the dashboard
- 2.0.2-CHG-11Setting who a stage forwards to
- 2.0.2-CHG-12The drawing register table
- 2.0.2-CHG-13The drawing file viewer
- 2.0.2-CHG-14Drawing location is its own column
- 2.0.2-ADD-18A column for the submitting company
- 2.0.2-CHG-15Stages that never applied to a drawing
- 2.0.2-ADD-19Collapsible group bands in the drawing register
- 2.0.2-FIX-02Stage cell colours in dark mode